Design of System for Controlling, Scheduling and Monitoring of Construction Project using System Software
Dublin Core | PKP Metadata Items | Metadata for this Document | |
1. | Title | Title of document | Design of System for Controlling, Scheduling and Monitoring of Construction Project using System Software |
2. | Creator | Author's name, affiliation, country | Ramadevi P.V.; Department of Construction Engineering and Management, Meenakshi Sundararajan Engineering College, Chennai, Tamilnadu; India |
3. | Subject | Discipline(s) | M.E |
3. | Subject | Keyword(s) | Project Management; Scheduling of Works; Management of Work Task |
3. | Subject | Subject classification | Construction Engineering and Managemant |
4. | Description | Abstract |
Construction monitoring, controlling and scheduling is one of the important tool in a construction project. Every construction project involve with a lot of activities which need to be planned, monitored, controlled and scheduled properly to ensure the completion of the project. These project management techniques of planning, scheduling and controlling are used to complete the project within the stipulated time, scope, quality and cost. These techniques can be applied to all types of projects. Resource allocation and levelling are among the top challenges in project management, due to the complexity of projects. The main objective of this project is to optimize the resource schedule of construction project activities in order to minimize the total duration of the project, maximization of net present value, or minimization of average tardiness subjected to both precedence and resources constraints using an optimization technique called Ant Colony Optimizing Algorithm (ACO). This work describes an algorithm approach to Resource Constraint Project Scheduling Problems (RCPSP) in construction industry. The study on the optimization technique that is genetic algorithm and its terminology, operator, parameter used is clearly depicted. The modern approach of using ant colony algorithm technique to solve the Resource Constraint Project Scheduling Problems (RCPSP) problem for a construction project with constraints and to find the best optimal solution by overcoming the drawbacks in other optimization technique. The algorithm adapts to dynamic factors such as changes to the project plan or disturbances in the schedule execution. The ACO procedure then searches for an optimum set of tasks and priorities that produce shorter project duration and better-levelled resource profiles. |
5. | Publisher | Organizing agency, location | |
6. | Contributor | Sponsor(s) | |
7. | Date | (YYYY-MM-DD) | 2014-05-23 |
8. | Type | Status & genre | Peer-reviewed Article |
8. | Type | Type | |
9. | Format | File format | |
10. | Identifier | Uniform Resource Identifier | http://technical.cloud-journals.com/index.php/IJACEAR/article/view/Tech-261 |
11. | Source | Journal/conference title; vol., no. (year) | International Journal of Advanced Civil Engineering and Architecture Research; Published Papers |
12. | Language | English=en | en |
14. | Coverage | Geo-spatial location, chronological period, research sample (gender, age, etc.) | |
15. | Rights | Copyright and permissions |
Copyright Terms & Conditions Authors who publish with this journal agree to the following terms: a. Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal. b. Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal. c. Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work Cloud Publications reserves the right to amend/change the copyright policy; with/without notice.
|